Up and over
How much main boom and luffer do these picks actually require? Compare one setup with a move if the jib gets excessive.
Your job: configure a crawler to reach the roof picks over the building. Adjust the main boom and luffer, compare working from one side with moving to both sides, and find a combination that clears the roof and reaches the work. With both sides enabled, get the tip to the midpoint from each side. More than one configuration can work.
Elevation
Reference section toward buildingPlan
Top view · select a pickGold: main boomBlue: luffing jibCross: hook at current radius
Selected pick
A spatial exercise
Loosely based on an LR 1300 crawler. Explore how main boom, luffer, angles and position affect reach over a building. Geometry and crane details are simplified; capacity is not calculated.
Building a real crane plan? Use the manufacturer’s charts for your exact machine and configuration: Liebherr LR 1300 SX ANSI/ASME US data sheet ↗.
Related Field Note: Use 4D to test the erection plan → follows the same idea of adding detail when it changes a planning decision.
What the check means
The fictional building is 160 ft tall and 260 ft deep. With both sides enabled, each setup must reach at least the midpoint. Every pick must be inside at least one enabled setup’s geometric envelope. The model also checks roof-edge clearance and an 8 ft tip-height allowance.
One crane moves between the two setup locations. Slewing turns its drawing in plan but does not change its full reach circle. The elevation remains a section facing into the building, not a clearance calculation for the selected slew direction.
No load charts, rated capacity, hook path, three-dimensional collision checks, rigging, ground bearing or stability are evaluated. The schematic support frame and cables are illustrative.